PROJECT

Port of Miami Terminal B

•Chilled water system with a dedicated CEP
•Multiple AHUs/FCUs
•All Supply and Return air duct was insulated with duct wrap
•Chilled water piping insulated with foam glass
•Exposed piping insulated with aluminum jacketing
•Underground piping insulated with foam glass and pittwrpa jacketing
•Underground valve boxes insulated

Related

Universal Orlando Meter Replace
Universal Studios Project 901
Alanik Hotel